Modern Modular carried out the fabrication, assembly, and installation of the PTT Gas Station Fuel Island Steel Structure (P1-2000) for the Khai Suranaree branch. The project focused on structural strength, safety, and engineering precision to support efficient operation within the fuel station environment. Quality control was maintained throughout every stage, from factory fabrication to on-site installation.
Project Highlights
Scope of Work



